Kingsway Sporting Complex

  • kingsway1
  • kingsway2
  • kingsway3
  • kingsway4
  • Kingsway Sporting Complex – WAWW

Downer EDI Works P/L were contracted to re – surface the football oval at Kingsway, which involved removing the grass and 500mm of soil from the entire oval and replacing. WA Wheelwash were requested to provide a solution to help control the spread of stinging nematodes which were present in th soil. As there are many other sporting grounds and turfs in close proximity, it was a requirement to avoid the spread of contamination through the movement of trucks and machinery. WA Wheelwash supplied a standard 8.0m wheelwash bath which all trucks and machinery passed through on exit from site, cleaning dirt and dust off their wheels and assisting to control the spread of the nematodes.

Comments are closed.